Launch offer — valid today only

📄 Digital book in PDF · read it on your phone or print it

Party Wall Work in Drawings: the Right Notice, the Right Period From Notice to Award, in the Same Order Every Time

For England and Wales. Notifiable works, the three notices, the 3 m and 6 m rules, the 14-day reply, surveyors, schedules of condition and awards. Each topic has its own page: the drawing first, then what you need to remember. 65 illustrated pages.

START LEARNING IT THIS WAY

🔒 Secure checkout · PDF by email · 30-day guarantee

Every topic, its own pageEach rule drawn in plan and section, with the explanation beside it
65 illustrated pages8 parts, from what the Act does to the worked terraced house example
Up-to-date sourcesParty Wall etc. Act 1996 and the government's explanatory booklet
PDF by emailFormat

Look Inside the Book

Every page has one big drawing and a box with the time limits, distances and steps you need to know:

Works → notice → reply → if disputed: surveyor, schedule, award → works → making good
Works → notice → reply → if disputed: surveyor, schedule, award → works → making good
Projecting footings allowed with compensation; special foundations only with prior written consent.
Projecting footings allowed with compensation; special foundations only with prior written consent.
Section 1 and section 6: 1 month · Section 3: 2 months, all as minimums
Section 1 and section 6: 1 month · Section 3: 2 months, all as minimums
From service: 14 days to reply; at least 1 month (s.1, s.6) or 2 months (s.3) to start
From service: 14 days to reply; at least 1 month (s.1, s.6) or 2 months (s.3) to start
Agreed surveyor vs two surveyors: both settle the dispute by award (s.10(1))
Agreed surveyor vs two surveyors: both settle the dispute by award (s.10(1))
Not required by the Act, but the booklet calls it 'most prudent' and it may be annexed to the award.
Not required by the Act, but the booklet calls it 'most prudent' and it may be annexed to the award.
Section 10(12): the right to do the work, when and how, and any other matter, including costs
Section 10(12): the right to do the work, when and how, and any other matter, including costs
Loft beams = s.3 notice, 2 months · 1 m deep footing within 3 m, below the neighbours' foundations = s.6 notice, 1 month
Loft beams = s.3 notice, 2 months · 1 m deep footing within 3 m, below the neighbours' foundations = s.6 notice, 1 month

Swipe to see more →

These are real pages from the book. The table of contents is the full one: 8 parts and 61 topics.

The Problem Isn't You. It's How It Was Explained to You.

You're at the client's kitchen table with a loft and a rear extension on the plans, and they ask which party wall notice they need. You know there's more than one, but not which goes with which job.

The guidance explains the notices in paragraphs: a section number here, a minimum period there, an exception further down. Three notices, two periods, and nothing on the page that holds them together.

Section 1 and section 6: 1 month · Section 3: 2 months, all as minimums

In the book that's one page: the three notices side by side, each with a drawing of the work it covers. Section 1 and section 6: 1 month. Section 3: 2 months. All as minimums, in a box you can't miss.

The rest works the same way. The 3 m and 6 m rules drawn in section, the 14-day reply, why silence isn't consent, the schedule of condition room by room and how an award is laid out: each one on its own page.

So you answer the client there and then, with the right notice and the right period. No going back to the booklet to check.

COMPARE FOR YOURSELF

The Same Topic, Two Ways to Learn It

THIS
  • The guidance: line after line of text
  • Notices and consents explained only in words
  • You go into the client meeting with doubts
Where a building owner proposes to erect a new wall at the line of junction between two properties not previously built upon at that line, notice describing the proposed wall is to be given to the adjoining owner not less than one month prior to commencement. Should the wall be intended to stand astride the line, the written consent of the adjoining owner is required; in the absence of such consent, the wall is to be placed wholly on the building owner's land, projecting footings beneath the adjoining land being permissible subject to compensation for any resulting damage.
FOR THIS
  • The new boundary wall in one drawing
  • The notice period and consent in a box
  • You see it and you get it
Projecting footings allowed with compensation; special foundations only with prior written consent.
CONTENTS

Take a Look at the 8 Parts and 61 Topics

The Act at a glance, notifiable works, serving notices, replies and time limits, surveyors and disputes, the schedule of condition, the award and a worked example: 65 pages, all illustrated

IThe Act at a glance · pp. 5-11
  1. What the Act actually does
  2. England and Wales only
  3. Party wall: the two types
  4. Party fence wall and party structure
  5. Building owner and adjoining owner
  6. What the Act doesn't cover
  7. The traffic light used in this book
IIIs it notifiable? · pp. 12-21
  1. Section 1: a new wall on the line of junction
  2. Section 1: footings under the neighbour's land
  3. Section 2: the work list for existing party walls
  4. Loft beams cut into the party wall
  5. Removing a chimney breast
  6. Minor works that usually aren't notifiable
  7. The 3 m rule
  8. The 6 m rule and the 45° line
  9. Measuring for the 3 m and 6 m rules
  10. One job, several notices
IIIServing notices · pp. 22-29
  1. The three notices side by side
  2. What a party structure notice must contain
  3. What a line of junction notice must contain
  4. What an adjacent excavation notice must contain
  5. Who to serve: finding every owner
  6. How to serve a notice
  7. 12 months to start the work
  8. Frequent errors in notices
IVReplies and time limits · pp. 30-36
  1. The timeline from notice to start
  2. The 14-day reply
  3. Silence is not consent
  4. Section 1 without consent
  5. The neighbour's counter-notice
  6. Shortening the periods by agreement
  7. The 10-day request to appoint
VSurveyors and disputes · pp. 37-43
  1. Agreed surveyor or two surveyors
  2. The third surveyor
  3. Who can act as a surveyor
  4. Appointments and selections in writing
  5. The surveyor's duty: impartial
  6. Who pays the costs
  7. When to call a solicitor
VISchedule of condition · pp. 44-50
  1. Why a schedule of condition
  2. When and where to inspect
  3. Room-by-room order
  4. Recording cracks
  5. Finishes, damp and the outside
  6. The photo log
  7. After the works: the check
VIIThe award · pp. 51-58
  1. What an award decides
  2. How an award is laid out
  3. Drawings and the schedule annexed
  4. Working hours and methods
  5. Access to the neighbour's land
  6. Security for expenses
  7. Serving the award and the 14-day appeal
  8. Damage and making good
VIIIWorked example and review · pp. 59-65
  1. Worked example: the terraced house
  2. Worked example: notices and replies
  3. Worked example: from surveyors to award
  4. The decision diagram
  5. Frequent errors from start to finish
  6. Checklist before you serve
  7. Glossary at a glance

One Page, One Topic, All Clear

Think of it this way:

A job comes in on a terraced house: steel beams for a loft going into the party wall, and a rear extension footing dug a metre deep. The client wants to know which notices, and how long before work can start.

You open the page on the terraced house. The loft beams are marked section 3 notice, 2 months. The 1 m deep footing within 3 m, below next door's foundations, is marked section 6 notice, 1 month. Two notices, two periods, on one drawing.

Agreed surveyor vs two surveyors: both settle the dispute by award (s.10(1))

The same goes for the 6 m rule and the 45° line, the 10-day request to appoint, the third surveyor, recording cracks and the 14-day appeal after the award: each one on its own page.

Party Wall Surveying Illustrated is 8 parts and 65 illustrated pages, one topic per page, and at the end a worked example from notice to award, a decision diagram and a checklist before you serve.

What you see drawn, you don't have to memorize.

What's Inside Party Wall Surveying Illustrated:

Ipp. 5-11

The Act at a glance

What the Act does, England and Wales only, the two types of party wall, party fence walls and structures, who's the building owner and who's the adjoining owner, what it doesn't cover and the traffic light used in the book.

IIpp. 12-21

Is it notifiable?

New walls on the line of junction, footings under the neighbour's land, the section 2 work list, loft beams, chimney breasts, minor works, the 3 m and 6 m rules, how to measure and one job with several notices.

IIIpp. 22-29

Serving notices

The three notices side by side, what each one must contain, finding every owner, how to serve, the 12 months to start and the most frequent errors in notices, so the notice you send is the right one, to the right people, on the right date.

IVpp. 30-36

Replies and time limits

The timeline from notice to start, the 14-day reply, why silence isn't consent, section 1 without consent, counter-notices, shortening the periods and the 10-day request to appoint.

Vpp. 37-43

Surveyors and disputes

Agreed surveyor or two surveyors, the third surveyor, who can act, appointments in writing, the impartial duty, who pays what and when to call a solicitor.

VIpp. 44-50

Schedule of condition

Why a schedule of condition, when and where to inspect, room-by-room order, recording cracks, finishes, damp and the outside, the photo log and the check after the works.

VIIpp. 51-58

The award

What an award decides, how it's laid out, drawings and schedule annexed, working hours and methods, access, security for expenses, serving it, the 14-day appeal and making good.

VIIIpp. 59-65

Worked example and review

A terraced house taken from notices and replies to surveyors and award, the decision diagram, the most frequent errors from start to finish, a checklist before you serve and a glossary at a glance.

At the end of the book: A worked terraced-house example, a decision diagram, a checklist before you serve and a glossary at a glance.

Plus: 2 Free Books

Notifiable or Not? 40 Job Scenarios

BONUS 1: «Notifiable or Not? 40 Job Scenarios»

Value on its own: US$ 17.90

Practise deciding which notice a job needs, if any, with 40 everyday scenarios and a drawn answer for each one.

Party Wall Quick-Reference Cards

BONUS 2: «Party Wall Quick-Reference Cards»

Value on its own: US$ 14.90

The notices, time limits and award parts on printable cards, so you can check the order at a glance on site or before a meeting.

Party Wall Surveying Illustrated with 2 Free Books

  • Party Wall Surveying Illustrated: 65 illustrated pagesUS$ 63
  • BONUS 1: Notifiable or Not? 40 Job ScenariosUS$ 17.90
  • BONUS 2: Party Wall Quick-Reference CardsUS$ 14.90
  • High-resolution PDF to printIncluded
Total value US$ 95.80
YOUR PRICE:
US$ 27
You save US$ 68.80
YES, I WANT PARTY WALL SURVEYING ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

Secure purchaseEncrypted payment30-day guarantee

PDF by email: We email you Party Wall Surveying Illustrated as a PDF, together with the two free books. It's a single payment: no installments, no extra charges.

Who This Book Is For

You're adding party wall work

You're adding party wall work

The whole procedure in one order, from notifiable works to the award, so you can offer the service without leaning on someone else.

A notice is about to go out

A notice is about to go out

The three notices, what each must contain and every time limit drawn on a timeline, so you serve the right one on the right date.

You already run the jobs

You already run the jobs

Schedules of condition, award layout and the traffic light for when to call a surveyor or solicitor, to check at a glance before a meeting.

Everything You Get Today

US$ 95.80US$ 27
YES, I WANT PARTY WALL SURVEYING ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

30DAYS
GUARANTEE

30-Day Guarantee

Try Party Wall Surveying Illustrated for 30 days, bonus books included.

We refund everything if the file won't open, if the book isn't what you see here, if you were charged twice or if the email doesn't arrive. Just email us.

You pay once. No subscriptions.

Frequently Asked Questions

Is it for me if I'm a builder or surveyor taking on party wall work?

Yes. It goes from the checklist of notifiable works to how an award is laid out, with a worked example. It also helps homeowners planning a loft or extension who want to do it properly with next door.

Where does the content come from?

From the Party Wall etc. Act 1996 and the current government explanatory booklet for England and Wales, explained with our own drawings. Scotland and Northern Ireland have a different regime, and the book says so.

Is it official material?

No. It's an independent study and reference guide. It has no link to any government body or professional institution.

Does it replace training or legal advice?

No. It isn't legal advice. Every page has a traffic light that shows when you can carry on and when to call in a party wall surveyor or a solicitor.

Does it give me a qualification or a CPD certificate?

No. It's a study and reference book, not a course, so there's no certificate. The 40 job scenarios in the bonus book are written for this book and aren't taken from any exam or official source.

When and how do I get it?

The book and the 2 bonus books arrive as PDFs by email, at the address you enter at checkout.

Do I have to pay every month?

No. It's a one-off payment.

Can I have it on paper?

Yes. The PDF prints well at home or at a print shop, so you can keep it on site or in the van.

How does the refund work?

You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.

Before You Close This Page

No more rereading the Act with nothing sticking.

The 3 m and 6 m rules: you see them drawn, and that's that.

You go into every job knowing where each step is.

Drawings make studying faster.

The book is right below.

One-time payment: US$ 27 · Guarantee: 30 days · PDF by email

YES, I WANT PARTY WALL SURVEYING ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.